The Hotel Europejski is one of our flagship projects, featuring a full interior arrangement completed under a “turnkey” system. The project included:

F&B (Food & Beverage):
Comprehensive works on the ground floor, including the arrangement of a restaurant, bar, patisserie, humidor, private dining rooms, entrance, and restrooms.

Scope of work:

  • Built-in veneered furniture.
  • Wooden and stone cladding.
  • Palace parquet flooring and mosaics.
  • Glass enclosures on steel and aluminum frames.

Hotel Rooms:
Completion of 102 apartments, including Presidential and Palace Suites.

Scope of work:

  • Veneered wall paneling.
  • Premium-class furniture.
  • Mirror ceilings, stucco, and gypsum decorative moldings.
  • Custom drywall structures.
  • Acoustic and fireproof doors with certifications​​.

Total project area: 8,650 m²​.

The Hotel Bristol is a prestigious project that involved comprehensive modernization works:

Conference Rooms

  • Redevelopment of 8 conference rooms with the installation of AV systems.
  • Furnishing with veneered and upholstered wall paneling, premium-class furniture, smoked parquet floors, and gypsum decorative moldings.
  • Comprehensive installation of electrical and sanitary systems, as well as media control systems​​.

SPA and Gym

  • Modernization of the existing SPA Center and construction of a new gym.
  • Works included acoustic insulation, HVAC and electrical installations, as well as mirrored wall cladding​​.

Lane’s Gin Bar

  • General fit-out of the restaurant and bar, including finishing works, sanitary, HVAC, and electrical installations, as well as the installation of kitchen and bar technology​​.

Total project area: 2,800 m²​.

The execution of a modern facility involved comprehensive construction and finishing works carried out under the “design and build” system.

Scope of work:

  • Steel and reinforced concrete structures.
  • Sanitary, electrical, and HVAC installations.
  • Installation of decorative cladding and interior finishes.
  • Adaptive works and customization of the space to meet user needs.

The project was completed with the utmost precision, creating a functional and high-quality space.onalną i estetyczną, odpowiadającą wymaganiom inwestora i nowoczesnym standardom budowlanym.

Another of our prestigious projects involved the comprehensive modernization of hotel interiors. The project was completed under a “turnkey” system and included:

Rooms and common areas:
Renovation of 272 rooms, corridors, and elevator lobbies across 10 floors, as well as the Great Room area in the hotel lobby.

Scope of work:

  • Installation of wall cladding.
  • Replacement of carpeting.
  • Bathroom modernization.
  • Installation of veneered wall panels.
  • Stainless steel metalwork.

Total project area: 8,500 m²​​.

Comprehensive modernization of the hotel, blending elegance with modernity. The project included:

Rooms and common areas:
Renovation of 160 apartments, corridors, foyer, the ballroom, and conference rooms.

Scope of work:

  • Installation of wall cladding and carpeting.
  • Bathroom modernization.
  • Replacement of electrical systems.
  • Construction and finishing works.

Total project area: Over 10,000 m². 000 m²​​.

Comprehensive renovations of Mercure hotels (Gdańsk, Poznań, Warsaw, Vienna) were carried out under a “turnkey” system, involving the refurbishment of rooms, corridors, and common areas.

Rooms and corridors:

  • Installation of wall cladding and floor carpeting.
  • Modernization of bathrooms with the installation of modern sanitary fixtures.
  • Replacement of electrical systems and lighting.

Scope of work:

  • Construction and finishing works with meticulous attention to detail.
  • Comprehensive replacement of heating and water installations.
  • Modernization of restaurants, bars, and conference rooms.

Thanks to our efforts, the interiors of Mercure hotels were transformed with a modern design and enhanced comfort, meeting the brand’s highest standards as well as the expectations of guests and investors​​.


In Novotel hotels (Warsaw, Berlin, Poznań, Wrocław), we carried out a comprehensive adaptation of the facilities to meet new standards.

Common areas and safety:
The project included the modernization of fire protection systems and the redevelopment of common areas.

Scope of work:

  • Replacement of joinery and façades.
  • Sprinkler systems and fire alarm systems (SAP).
  • Installation of partition walls and interior finishes.

Project area: 4,900 m²​​.

Interior modernization in Ibis Hotels (Warsaw, Kraków) included refreshing the common areas. The project covered:

Lobby, bars, and restaurants:

  • Work in public areas.

Scope of work:

  • Installation of wall and column cladding.
  • Replacement of flooring.
  • Delivery of furniture.
  • Modernization of electrical and lighting systems.

Total project area: Over 5,000 m²​​.

Strona wykonana przez Creospace